Bills
26-2000 — Authorize a contract for construction services for the Central East Austin Water and Wastewater Pipeline Renewal Project for Austin Water with Underground Water Solutions, Co., in the amount of $4,067,015 plus a $406,702 contingency for a total contract amount not to exceed $4,473,717. Funding: $4,473,717 is available in the Capital Budget of Austin Water.
26-2000 is a measure before a local body in Texas. This page is what Rallybase holds about it and the date each part of it was read.
Its source has published no summary of it that Rallybase holds, and Rallybase prints none it cannot attribute to a source and a date.
As of 2026-08-22, the source's own latest action on it read: "Agenda Ready".
- Identifier
- 26-2000
- Level
- Local
- State
- Texas
- Jurisdiction identifier
- austintexas
- Where that identifier comes from
- austintexas — the Legistar jurisdiction that assigned this number. A city council has no session, so the URL carries the jurisdiction in that place instead.
- Latest action, as the source published it
- Agenda Ready
- Read on
What you can do from here
- Open letter draftingYou write the letter; sending it yourself is free
- Every bill Rallybase is tracking
What Rallybase does not know here
- Who sponsored it. The sync that loads these rows does not carry a sponsor.
- How anybody voted on it. Rallybase has not read roll calls for this body, which is our coverage that is empty and not a statement about whether a vote was held.
- A direct link to this measure's own text. The city publishes it through a search page rather than at a per-matter address we hold, so the link below opens that search rather than this document.
- When it is next scheduled to be taken up.
Other measures in Texas
- 26-2001 — Authorize a contract for construction services for the Elmhurst Drive Wastewater Pipe Renewal Project for Austin Water with HEI Civil Texas, LLC, in the amount of $4,784,754 plus a $478,476 contingency for a total contract amount not to exceed $5,263,300. Funding: $5,263,300 is available in the Capital Budget of Austin Water.
- 26-2002 — Approve an ordinance vacating approximately 126,437 square feet (2.9026 acres) of developed right-of-way being part of that certain tract of land out of the Santiago del Valle Grant, Abstract No. 24 originally granted in fee to Travis County and annexed into the city on May 21, 2026 by Ordinance No. 20260521-60, and being a portion of Hergotz Lane located northwest of Dalton Lane; requiring future dedication of a wastewater line easement and right-of-way; and authorizing the City Manager to exec
- 26-2003 — Ratify a contract amendment for engineering services for the Engineering Services for Electric Service Delivery contract for Austin Energy with Stanley Consultants, Inc., in the amount of $2,000,000 for a revised total contract amount not to exceed $9,500,000. Funding: $2,000,000 was available in the Operating Budget of Austin Energy.