Bills
26-5016 — Request for approval of a change in contract with Allgood Construction Co., Inc., in connection with West Gulf Bank Road from I45 to Airline Drive, adding 200 calendar days, with no change in the amount, Job No. 22/0461-13, UPIN 19101MF0XV01, Precinct 2, MWBE Contracted Goal: 25%, MWBE Current Participation: 40.15%.
26-5016 is a measure before a local body in Texas. This page is what Rallybase holds about it and the date each part of it was read.
Its source has published no summary of it that Rallybase holds, and Rallybase prints none it cannot attribute to a source and a date.
As of 2026-09-05, the source's own latest action on it read: "Passed".
- Identifier
- 26-5016
- Level
- Local
- State
- Texas
- Jurisdiction identifier
- harriscountytx
- Where that identifier comes from
- harriscountytx — the Legistar jurisdiction that assigned this number. A city council has no session, so the URL carries the jurisdiction in that place instead.
- Latest action, as the source published it
- Passed
- Read on
What you can do from here
- Open letter draftingYou write the letter; sending it yourself is free
- Every bill Rallybase is tracking
What Rallybase does not know here
- Who sponsored it. The sync that loads these rows does not carry a sponsor.
- How anybody voted on it. Rallybase has not read roll calls for this body, which is our coverage that is empty and not a statement about whether a vote was held.
- A direct link to this measure's own text. The city publishes it through a search page rather than at a per-matter address we hold, so the link below opens that search rather than this document.
- When it is next scheduled to be taken up.
Other measures in Texas
- 26-5017 — Request for approval of a change in contract with DTI A-Group, LLC / McCrory Engineering, in connection with Pinckney Infra Imp, adding 180 calendar days, with an addition in the amount of $28,000.00, Job No. 24/0215-4, UPIN 22102MF2D501, Precinct 2, MWBE Contracted Goal: 25%, MWBE Current Participation: 100%.
- 26-5018 — Transmittal by the Office of the County Engineer of a substantial completion certificate with LMC Corp, in connection with Wastewater System Rehabilitation - Spring Camp and Klein Park - 2022, Job No. 25/0079, UPIN 23103MF2VT01, Precinct 3.
- 26-5019 — Request for approval to execute an Interlocal Agreement with Harris County Municipal Utility District No. 478 for the construction of parallel parking spaces and associated appurtenances within the existing right-of-way of Winding Wonder Lane, UPIN NS104, Precinct 4.