Bills
26-5147 — Request for approval of a change in contract with CE Barker Ltd., in connection with Barwood Subdivision Drainage Improvements - 2018, with an addition in the amount of $261,096.64, Job No. 25/0227-01, UPIN 19103MF12H01, Precinct 3, MWBE Contracted Goal: 22.07%, MWBE Current Participation: 9.80%.
26-5147 is a measure before a local body in Texas. This page is what Rallybase holds about it and the date each part of it was read.
Its source has published no summary of it that Rallybase holds, and Rallybase prints none it cannot attribute to a source and a date.
As of 2026-09-05, the source's own latest action on it read: "Passed".
- Identifier
- 26-5147
- Level
- Local
- State
- Texas
- Jurisdiction identifier
- harriscountytx
- Where that identifier comes from
- harriscountytx — the Legistar jurisdiction that assigned this number. A city council has no session, so the URL carries the jurisdiction in that place instead.
- Latest action, as the source published it
- Passed
- Read on
What you can do from here
- Open letter draftingYou write the letter; sending it yourself is free
- Every bill Rallybase is tracking
What Rallybase does not know here
- Who sponsored it. The sync that loads these rows does not carry a sponsor.
- How anybody voted on it. Rallybase has not read roll calls for this body, which is our coverage that is empty and not a statement about whether a vote was held.
- A direct link to this measure's own text. The city publishes it through a search page rather than at a per-matter address we hold, so the link below opens that search rather than this document.
- When it is next scheduled to be taken up.
Other measures in Texas
- 26-5148 — Request for approval of an amendment to an agreement with D.R. Horton - Texas, Ltd. for the County to participate in the design, construction and final construction share payment of Butterfield Road from Ella Boulevard to east of Nenes Road (Nanes Tract Boundary), UPIN 19101MF0Y001, Precinct 1.
- 26-5149 — Request for approval of an amendment to an agreement with Entech Civil Engineers, Inc. for Professional Engineering Services to conduct a feasibility study in connection with Sidewalk - Energy Corridor and Multimodal Connectivity -- 2023, UPIN 24104MF38Q01, Precinct 4, MWBE Contracted Goal: 19.6%, MWBE Current Participation: 20.21%.
- 26-5150 — Request for approval of a change in contract with SER Construction Partners LLC, in connection with Pine Trails Subdivision Drainage Improvements (Sections 1-2-5-6) - 2018, deducting 46 calendar days, with an addition in the amount of $231,000.00, Job No. 24/0358-01, Grant Fund, UPIN 19101MF14202, Precinct 2, MWBE Contracted Goal: 26.94%, MWBE Current Participation: 39.42%.