Bills
26-5014 — Transmittal by the Office of the County Engineer of a substantial completion certificate with Statewide Traffic Signal Company, in connection with Intersection Improvements - Hufsmith Rd at FM 2978, Stuebner Airline Rd, & Kuykendahl Rd-Phase II-2024, Job No. 23/0341, UPIN 24103MF34P02, Precinct 3.
26-5014 is a measure before a local body in Texas. This page is what Rallybase holds about it and the date each part of it was read.
Its source has published no summary of it that Rallybase holds, and Rallybase prints none it cannot attribute to a source and a date.
As of 2026-09-05, the source's own latest action on it read: "Accepted".
- Identifier
- 26-5014
- Level
- Local
- State
- Texas
- Jurisdiction identifier
- harriscountytx
- Where that identifier comes from
- harriscountytx — the Legistar jurisdiction that assigned this number. A city council has no session, so the URL carries the jurisdiction in that place instead.
- Latest action, as the source published it
- Accepted
- Read on
What you can do from here
- Open letter draftingYou write the letter; sending it yourself is free
- Every bill Rallybase is tracking
What Rallybase does not know here
- Who sponsored it. The sync that loads these rows does not carry a sponsor.
- How anybody voted on it. Rallybase has not read roll calls for this body, which is our coverage that is empty and not a statement about whether a vote was held.
- A direct link to this measure's own text. The city publishes it through a search page rather than at a per-matter address we hold, so the link below opens that search rather than this document.
- When it is next scheduled to be taken up.
Other measures in Texas
- 26-5015 — Request for approval of an amendment to an agreement with A&R Engineering and Testing, Inc. in the amount of $19,937.00 for Professional Engineering Services regarding Construction Materials Testing and related Services for Miller Road 2 - Wallisville Road to US 90 - 2022, UPIN 22101MF2CW01, Precinct 1, MWBE Contracted Goal: 100%.
- 26-5016 — Request for approval of a change in contract with Allgood Construction Co., Inc., in connection with West Gulf Bank Road from I45 to Airline Drive, adding 200 calendar days, with no change in the amount, Job No. 22/0461-13, UPIN 19101MF0XV01, Precinct 2, MWBE Contracted Goal: 25%, MWBE Current Participation: 40.15%.
- 26-5017 — Request for approval of a change in contract with DTI A-Group, LLC / McCrory Engineering, in connection with Pinckney Infra Imp, adding 180 calendar days, with an addition in the amount of $28,000.00, Job No. 24/0215-4, UPIN 22102MF2D501, Precinct 2, MWBE Contracted Goal: 25%, MWBE Current Participation: 100%.